Lena boatman ready to navigation

Lena boatman

Lena boatman ready to navigation. The most important task internavigational period – training fleet to navigation – combined branches and divisions Lena United River Shipping Company. On the bases of technical operation of the fleet is being renovated on ships vymorozki, overhaul and restoration work of the main engines and propulsion ships.

“In terms of preparation works Zhatayskoy BTEF 53 units of the fleet, 17 of which have already been put in tehgotovnost. Peleduyskaya BTEF tehgotovnost put into ten units of the fleet, mainly tankers” Lenaneft” type and tugs. Vymorozochnymi works mastered 35% of the plan” – the Vasily Pletenevsky, Head of repairing “LORP”.

Lena boatman

Fleet Kirenskogo navigable portion advocated in p.Bubnovka, put under protection. Ship repair is open for tanker TO-1546 ships “Valentin Vychuzhin” and MP-2570. As of mid-January, produced 25% of the work put into tehgotovnost six of the eleven units of the fleet. Branch “LORP” in Olekminsk mastered 15% of the plan and put into tehgotovnost single vessel.

Fleet

Under the scrutiny of the company’s management is Belogorsky navigable section. Adopted a plan of working trips command and senior management Company, whereby at the end of December 2013 a commission headed by First Deputy General Director of JSC “LORP” S.Emelyanovym Abyisky area and visited places accidental sludge fleet that are put under protection. Reversal of repairs was scheduled for January 2014. To date, 25% vymorozki covered courts, the press service of “LORP”.

Source: IA SakhaNews

Translation: Google

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.